Thursday, April 3, 2014

Bathroom Progress

The great bathroom renovation is underway, and much has been accomplished. Before pictures are here.

The hall bath is just about finished.  The mirror needs to be cut down (the new vanity is taller) and I still need to get new towels and rugs, but other than that, it's done. Taupe, pale aqua, and white, very serene and spa-like. The vanity top is actually the same material & color as the shower surround; the shower wall is more true to color. We are using this bath while the master bath is being renovated, and everything is working fine.
Hall Bath Done

The master bath is underway. Demolition took place on Monday; plumbing Tuesday and yesterday. Here's what it looks like now:

Master Bath WIP

In other progress, I've decided to work on the Dresden Rows project next (see yesterday's post). The  top is now squared up and ready for me to make the backing.

I'm hoping to get more of one of the prints in the Broken Chevron project at Hancock's in Paducah later this month, so that project is still on hold for awhile longer. If I can find more, it will enable some design modifications to extend some of the chevron parts into a border. If not, I'll just piece the blocks together and call it done. Either way, I still like it.

Linking up with Really Random Thursday over at Live a Colorful Life; check out all the other random stories over there.

1 comment:

  1. Thanks for linking up. The bathrooms will be wonderful when completed. Renovation is not so fun during the process...

    ReplyDelete